Blog Page Template (Boxed Image)

What to Do Before Signing a Lease for a New Childcare Center Space

Patricia Kraisman

October 15

Before signing a lease for a new childcare center location, verify six things: that the space meets or can be modified to meet your state’s minimum square footage per child, that the plumbing configuration can support the required bathroom-to-child ratio, that the building’s occupancy classification and zoning permit a licensed childcare use, that exit paths and fire safety systems meet the requirements for childcare occupancy, that the outdoor space meets state minimums, and that the building’s systems can support a licensed program without costs that make the lease unworkable.

Square Footage: The Number That Determines Your Capacity

State licensing agencies set minimum indoor square footage per child. These minimums directly determine your maximum licensed capacity.

StateIndoor MinimumOutdoor Minimum
New Jersey35 sq ft per child75 sq ft per child (or 350 sq ft total minimum)
New York35 sq ft per child (preschool/school-age)Varies by program type
Pennsylvania40 sq ft per childState-specific by program type
Connecticut35 sq ft per childState-specific

Sources: NJDCF Chapter 52; OCFS 418-1; 55 Pa. Code Chapter 3270; CT OEC regulations. Licensing requirements vary and are updated periodically. Verify current requirements with your state licensing agency before making facility decisions.

Plumbing: Bathroom Ratios Are a Hard Requirement

State licensing codes require a minimum number of toilets and sinks for the number of children enrolled. In New York, OCFS 418-1 requires one toilet per 10 children. New Jersey’s Chapter 52 specifies similar ratios. A space with existing plumbing that falls short of these ratios requires new plumbing runs — a significant cost. Before signing, count the existing fixtures and calculate whether the ratio works for your intended enrollment. Adding bathroom fixtures to a commercial space can cost $15,000 to $40,000 or more depending on the building’s plumbing configuration.

Occupancy Classification and Zoning

Not every commercial space can become a licensed childcare center. Two specific barriers come up regularly:

Building occupancy classification. Most childcare centers operate in an E (Educational) or I-4 (Institutional, Day Care) occupancy under the International Building Code. A space currently classified as B (Business/Office) or M (Mercantile/Retail) may require a change-of-use permit, which can trigger a full code compliance review that adds substantial cost.

Zoning. Not every zone permits childcare use. Confirm with the local zoning office that the parcel is zoned to allow a licensed childcare facility before any lease commitment.

Exit Paths and Fire Safety

IBC Chapter 10 and NFPA 101 set specific egress requirements for spaces occupied by children. Childcare facilities require clearly marked exits, door hardware that adults can operate under emergency conditions, and in many jurisdictions, two separate egress paths from any occupied classroom. Walk the space and identify where the exits are relative to each occupied room before signing.

Outdoor Space

Most state licensing codes require dedicated outdoor play space. New Jersey requires 75 square feet per child outdoors or 350 square feet total minimum. Confirm the outdoor situation in the lease terms: does the lease include exclusive use of the outdoor space?

Assess Before You Commit

The S.M.A.R.T. Insights Lab ($897) evaluates a prospective facility space against the licensing requirements and educational goals that will define your program — giving you a documented picture of what the space can and cannot support before you sign anything.

Book a S.M.A.R.T. Insights Lab session

Latest Insights and Inspiration

Explore insightful articles that delve into innovative architectural designs and the art of creating spaces that inspire.

Early learning classroom interior, open floor and low shelving

What Your Classroom Looks Like From Three Feet Tall

An early learning classroom is usually planned by adults, for ...

Read More
Early learning classroom interior, planning, spatial programs, and design context with windows that shows kids playground outside.

What to Do Before You Hire an Architect for Your Childcare Center

A spatial program prevents the most expensive moment in any ...

Read More
Dense early childhood classroom with packed materials, shelving, and the hidden cost.

The Hidden Cost of a Classroom That Was Never Optimized

When directors think about the cost of their facility, they ...

Read More
Early learning classroom interior, open and organized layout

What Actually Happens in a S.M.A.R.T. Insights Lab Session

Most directors who book a S.M.A.R.T. Insights Lab session say ...

Read More
Daylit classroom with a round table, small wooden chairs, low shelves and a soft rug, headline Where Compliance Meets Vision

Designing a Reggio Emilia Classroom: What the Environment Actually Needs

A Reggio Emilia classroom needs three things that cannot be ...

Read More
S.M.A.R.T. Insights Lab consultation magazine cover — Arkitektura Consulting LLC early learning environment design

Pennsylvania Childcare Center Facility Requirements: The Design Rules You Must Meet

Pennsylvania childcare center facility requirements are governed by the Department ...

Read More
>